YOSEMITE WEST, Mariposa County — November 25, 2026. Visitors staying in Yosemite West who plan to enter Yosemite National Park by Highway 120 or connect from the north should account for a separate fire-safety work zone on Big Oak Flat Road. In its November 20 conditions update, the National Park Service listed potential 15-minute delays on weekdays during roadside fuel reduction.
Where crews are working
The National Park Service current conditions page identifies vegetation work between Foresta and Big Oak Flat, with related work along Tioga Road east of Crane Flat. Crews remove dead and fallen wood and some smaller trees to improve forest resilience and make future prescribed fire operations safer. This is not work on private streets within Yosemite West.
Who might encounter delays
Drivers arriving from Groveland on Highway 120 or traveling through the Big Oak Flat corridor toward Yosemite Valley may be affected. A visitor approaching Yosemite West from the south via Wawona Road/Highway 41 may use a different route. The 15-minute figure is an NPS planning estimate, not a measured delay for every vehicle. Check the actual direction of travel.
Other notices should not be confused
At the same November 20 update, the park listed Tioga Road, Glacier Point Road and Mariposa Grove Road closed due to snow, plus weekday stabilization work at El Capitan Bridge. Those are distinct projects and seasonal road conditions. A published park status is not guaranteed unchanged through Thanksgiving. Get live status at 209-372-0200 (press 1, then 1) and check Caltrans QuickMap for state highways.
Cover: illustrative forest road photograph by Dan Meyers / Unsplash; not the current construction location in Yosemite.
Primary source: National Park Service, Yosemite Current Conditions (last updated November 20, 2026), Big Oak Flat Road Fire Safety Work. No current wildfire, crash or closure of Yosemite West is alleged.
Support Yosemite West News
Choose how to support Yosemite West News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Yosemite West News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Yosemite West News
- Yosemite West Thanksgiving Travel: Glacier Point and Tioga Roads Closed for Winter, NPS Says →
- Yosemite West Road Assessment of $8 a Month Lacks Reserve for Snow Equipment, County Says →
- County Identifies Yosemite West’s Single Water Well as a Critical Reliability Risk →
- Mariposa County’s 2026 Yosemite West Rate Study Covers 235 Water and Sewer Connections →
- Mariposa County: Yosemite’s Dome Fire North of Wawona Dome Listed 95% Contained →
